Containers4You Mobile unitContainers4You Refrigeration unitContainers4You Sitevault unit
HOME ENQUIRIES DELIVERY & COLLECTION STORAGE SOLUTIONS TECHNICAL SUPPORT ABOUT US CONTACT
Enquiry Form
Which Container
Why Choose Us
FAQ

Site Condition/Access Guide

Help us to help you by following these DO's and DONT's for a smooth delivery.

  • Do tell us if the containers will need to be lifted over walls, fences, buildings, obstructions or other containers, as this will require an independent crane.

  • Do tell us if you want containers placed inside a building as access and height clearance restrictions apply.

  • Do ensure the area is level and has hard standing capacity. If ground is soft or uneven, we may be able to provide sleepers as a base, but you need to inform us in advance.

  • Do allow three clear metres of space at the machinery end of temperature-controlled units. This is necessary to avoid blocking airflow and to enable the engineer to service the equipment.

  • Dont choose a location that blocks drain or fire exits. If units need to be repositioned after delivery, there will be an extra charge.

  • Dont locate a temperature controlled unit more than 10 metres from the power supply. We can supply extra cable but this will be charged.

  • Dont wait until after the driver leaves to check that delivery is to your satisfaction. He/she will require a signature to confirm that the unit is in the correct position, the doors operate correctly, locks work (if supplied) and there are no defects with the equipment. A method Statement can be supplied prior to delivery, if required.

      If you are unsure about any of these points, we can also offer a site inspection service to assess your delivery needs.